As Özok Steel, the steel villa installation process we carried out in Ankara Incek Tarman region was meticulously planned and successfully completed. In the first stage, we held a comprehensive meeting with our customer and analyzed their needs and expectations in detail. Then, we determined the requirements of the project by conducting a field survey and created a plan for the assembly process.
In the second phase of the assembly process, we started with the procurement and preparation of equipment and materials. Our professional team carried out the installation in accordance with the specifications required by the design, and we achieved a safe and aesthetic result by working meticulously at every step. Upon completion of the project, we carried out a detailed control and finalization process to ensure our customer's satisfaction.